MAIN WORK: The main works included the installation and assembly of a Liquefied Natural Gas storage tank of 180 tons. MAN has also retrofitted the two main engines and installed several pieces of equipment that are part of the gas control plant, as well as all monitoring and control equipment for the entire system, in order to allow the ship to navigate both fuel and LNG.